Completed August 21, 2015 for Windy Heights Farm Market, Ruffs Dale, PA.
Total time from approved design to completion – 2 weeks.
- Final approved design rendering
- Perfect installation day.
- 5′ deep holes.
- 5″ steel poles- going up!
- Leveling and setting the poles.
- Final level check!
- Pouring the concrete.
- Ready for the faces.
- Laying the faces.
- Assembling the faces to steel frame.
- Craning the faces in to place.
- Sign artist at work!
- Side 1 installed.
- Steel poles, frame, and backs of sign painted black.
- Side 2 installed.